Nov. 2 removal of the Three Hills pump house by Red The Deer’s Diamond Demolition moves the Town closer to resuming full water services by the end of next summer. The new plant, constructed on the same site by Peace River’s AGS Mechanical Contractors, will allow the resumption of bulk water sales. The four-decades-old facility’s water mainline break in April resulted in Town insurers determining that the building was beyond repair. ECA Review/D. Nadeau